|
Harry Warren Construction are conversant with all sizes and types of pipework installations, from 1/8” stainless steel capillary tube to 78” main cooling water lines in power stations. We have our own off-site facilities for pre-fabrication work, testing, and painting. We are also well equipped for on-site contracts, where our safety record is first rate. Before commencing on site, we produce a Safety Method Statement, risk assessments, and COSHH assessments.
|